Mettur Dam Park Salem Tamil Nadu Timings & History


It is Mettur Dam is on River Cauvery at the foothills of the Western Ghats and is the biggest Dam located in Tamil Nadu, Salem. Mettur Dam park timings are among 9 am and 6 pm.

 


Mettur Dam

Mettur Dam Park Mettur Dam Park is one of the most stunning dams in India and is a great spot to unwind and loosen up. Visitors can spend a calming time in its stunning exercise middle.


The English presented a few dollars to the humans dwelling in Nayambadi city, which become in which the Dam became positioned all through that point. They also helped to get the residents to go away.


The maximum crowded areas near Salem may be found at Mettur Dam. It is viable to go to the Dam there and revel in a sightseeing ride too. The water store with its steep terrain is taken into consideration a warm area located inside the Salem District.






If the dam's level of water is low, it is possible to take a look at the historic Hindu churches and shrines which might be which can be preserved on this historical vicinity. But, the natives who resided in Nayambadi are living in Martalli metropolis, as well as the towns in the area. These cities had been as soon as a part of Erode, Tamil Nadu, before their incorporation into the state of Kollegal, Karnataka.


If there has been a combat and the villager became always the victim. They might rush round in all directions to ensure their lives. The guys could fight to shield the town with gunsliters while maintaining their kids and better halves secure at home.


The Dam is a big engineering surprise. Its period is more than 1,700m and is capable of preserving greater than two billion litres of water. It turned into constructed in 1943, about 30 miles away from Salem placed in Mettur Village.


The lush panorama makes it a fave for vacationers. One of the maximum wonderful factors is its architecture: the paintings of Indian engineering expertise.



History

Mettur Dam has a superb story to tell. It is the longest and oldest Dam placed in India. The construction began in 1925 and took 9 years to complete The dam turned into officially opened within the presence of Governor Sir George Stanley on August 21, 1934.


The Dam is assumed to have been financed with UK price range to evacuate the region around the Dam. However, whilst the extent of its water decreases, Hindu and Christian sculptures and idols are discovered from the floor.


The Mettur Thermal Power station is an energy source that could be a base load for the whole Tamil Nadu Electricity Board. It is most of the primary resources of energy for the entire kingdom.



Mettur Dam Park Timings


Here are the Mettur Dam Park timings:


DayMettur Dam Park TimingsMonday9 AM to six PMTuesday9 AM to 6 PMWednesday9 AM to six PMThursday9 AM to 6 PMFriday9 AM to six PMSaturday9 AM to six PMSunday9 AM to 6 PM



How do I reach


By Train:

The closest railway station that is near Mettur dam is Salem. Mettur dam may be found in Salem placed 55 kilometers away.


By Air:

The closest airport is Peelamedu airport, which is set 100km away a long way from the Dam.


By Road:

You can reach the Dam with the aid of taxi or bus It will take round one and a quarter hour from Salem located 40 kilometers away.


Mettur Dam Park Phone Number

Ph No. 0427-2422318, 2422319, Cell: 8220010017.

Entry Ticket Cost: Rs.5 in keeping with head.